TREB MODULE – Manufacturing Aid 

Customer: Hadfield Services Limited for Jaguar Land Rover Assembly Plants

Product Requirements :

  • To keep vehicle connected to the battery during manufacturing;
  • To stop false flagging Diagnostic Trouble Codes during the manufacturing process;
  • To allow the vehicle battery to charge for 3600 seconds on every umbilical connection;
  • To be robust and survive 1.5m drop test;
  • To have good connectivity robustness;
  • One side of terminations to have 50mm of exposed cable ready to be terminated on site.

INTERFACE BOARD – System Testing Aid 

Customer: Hadfield Services Limited for Jaguar Land Rover Development Plants

Small Batch Production

  • SMT;
  • PCB Assembly – Through-hole soldering;
  • Final Assembly of switches and display unit;
  • Functional Test